Sidewalk on Undeveloped Lots

Print
Press Enter to show all options, press Tab go to next option

Section 445.030K2a5 of the Raymore Unified Development Code requires the owner of any undeveloped lot within a subdivision phase to construct a sidewalk on that lot when 66% or more of the lots on the same side of the street in the same block already have a sidewalk and it has been 3 years from the date the first Certificate of Occupancy was issued in the subdivision or subdivision phase that contains the undeveloped lot.

2019 Program

On February 7, 2019 notices were mailed to the properties listed below that met the threshold that requires sidewalk to be installed.  Property owners have until August 1, 2019 to either install sidewalk upon the undeveloped lot or obtain a building permit for a home on the lot.  In September, if the sidewalk is not installed or a permit issued for a home to be constructed, the City Council will hold a public hearing to determine if the City shall install sidewalk upon the lot and levy a special tax assessment on the property.

Eagle Glen

  • 5th Plat Lot 296 (1309 Belinder Drive)

Edgewater at Creekmoor

  • 4th Plat Lot 97 (1013 Bridgeshire Drive)
  • 4th Plat Lot 113 (1400 Lakepoint Cove)
  • 4th Plat Lot 119 (1400 Kenton Lane)

High Point at Creekmoor

  • 2nd Plat Lot 21 (827 Creekmoor Pond Lane)

Meadowood of The Good Ranch

  • 1st Plat Lot 16 (713 Redtop Lane)
  • 2nd Plat Lot 80 (720 Gamma Grass Place)

Ramblewood

  • 1st Plat Lot 43 (100 Samantha Street)
  • 1st Plat Lot 48 (216 Elissa Drive)
  • 1st Plat Lot 54 (204 Elissa Drive)
  • 1st Plat Lot 55 (202 Elissa Drive)

Shadowood

  • 4th Plat Lot 181A (810 S. Franklin Street)

Westbrook at Creekmoor

  • 7th Plat Lot 168 (1503 Lewis Circle)
  • 9th Plat Lot 278 (918 Creekmoor Pond Lane)
  • 9th Plat Lot 279 (916 Creekmoor Pond Lane)
  • 10th Plat Lot 284 (1208 Dunvegan Lane)
  • 10th Plat Lot 291 (1115 Dunvegan Lane)
  • 10th Plat Lot 293 (1119 Dunvegan Lane)

2018 Program

On January 31, 2018 notices were mailed to the properties listed below that met the threshold that requires sidewalk to be installed.  Property owners had until August 1, 2018 to either install sidewalk upon the undeveloped lot or obtain a building permit for a home on the lot.  On September 10, 2018 City Council held a public hearing to determine if the City shall install sidewalk upon the lot and levy a special tax assessment on the property.  On September 24, 2018 the Council confirmed that the City is to install sidewalk on the lots identified below.  The property owners now have until September 1, 2019 to install the sidewalk or secure a permit to construct a home on the lot or the City will install the sidewalk and file a special assessment on the property to recover the costs for installation.

Edgewater at Creekmoor

Whitetail Run

 

2016 Program

At its October 10, 2016 meeting City Council confirmed that the City will install sidewalk upon 10 lots determined to meet the requirement to have sidewalk on the undeveloped lot.  Property owners installed sidewalk on 5 of the lots.  The City installed sidewalk on the remaining 5 lots and have been reimbursed for the costs of the installation on 4 of the lots.  The property listed below has an unpaid invoice and/or special assessment filed on the property.

Edgewater at Creekmoor

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer